EV Infrastructure · Ghana · 2027

Where Africa
Plugs In.

Fast charging and battery swap infrastructure built for Africa's commercial fleets.

Pilot Sites Q1 2027Accra, Ghana
ChargeGo forecourt hub concept — two dual-port DC fast chargers and a 15-slot battery swap cabinet under a solar canopy at dusk in Accra.
Pilot Hub ConceptAccra · 2027
Current Progress
Where we are today
Anchor customer secured
First pilot sites identified
Technical platform selected
Regulatory engagement underway
The Opportunity

Commercial fleets are leading
Africa's EV transition.

Ghana's EV market is early but accelerating. Commercial vehicles are arriving faster than the infrastructure to charge them.

Existing forecourts mean faster deployment and lower capital requirements — with anchor demand contracted before every site opens.

3
Pilot Sites
Q1 2027
Launch
Accra
First
Why Now

Timing that compounds.

01

EV adoption is accelerating

Commercial EVs are arriving in Ghana faster than the infrastructure to charge them. Fleets need reliable charging before they can scale.

02

Forecourts already exist

Existing fuel networks mean faster deployment and lower capital requirements — no land acquisition, no greenfield delays.

The Model

Transforming existing forecourts into hybrid charging hubs.

Every hub combines DC fast charging and battery swap technology, giving fleets the flexibility to choose the fastest option for every duty cycle.

01

Site

We partner with existing fuel station networks to install at their forecourts. No land acquisition. No new real estate risk.

02

Infrastructure

Every hub combines DC fast charging, battery swap, a solar canopy, and grid connection — giving fleets flexibility for every duty cycle.

03

Demand

Anchor agreements are contracted before we build. Utilization is de-risked from Day 1.

ChargeGo hub concept, a solar canopy over fast chargers at an existing forecourt at dusk.
Pilot Hub

Solar-supported. Grid-connected. Modular by design, replicable across the forecourt network.

Deployment Roadmap

Accra first. West Africa next. Then across Africa.

01 / 04
Inside a Hub

One hub. Multiple ways to stay moving.

DC Fast Charging
High-power, short dwell time
Battery Swap
Minutes back on the road
Solar Canopy
On-site clean generation
Grid Connection
24/7 baseline capacity
A fleet of commercial electric delivery vans charging under a solar canopy in Accra.Commercial electric delivery e-bikes with cargo boxes charging at a ChargeGo hub in Accra.
In Deployment

Built for scale. Engineered for uptime.

From cargo vans to last-mile e-bikes — engineered around commercial duty cycles for fast turnaround and high throughput.

Why ChargeGo

A durable advantage, built in from Day 1.

01

Demand secured before deployment

Anchor agreements are contracted before we build. Utilization is de-risked from Day 1.

02

Existing forecourts accelerate rollout

Deploying at established fuel networks means faster permitting, lower capex, and no land risk.

03

Hybrid hubs, built to replicate

DC fast charging plus battery swap in a modular design that scales across every site.

Where We Are

Signed. Sited. Building.

Phase 1: Pilot Deployment. Three operational charging sites in Accra, Ghana by Q1 2027.

01
Anchor Demand

Anchor Letter of Intent signed for pilot sites.

02
Sites

Accra forecourt locations shortlisted; site assessment underway.

03
Grid & Regulatory

Grid connection application filed; regulatory tariff process in motion.

04
Corporate

ChargeGo Ltd registered in Ghana; Delaware C-Corp HoldCo established.

The Team

Infrastructure experience.
African market conviction.

Jennifer Nnuro, Founder of ChargeGo
Founder
Jennifer
Nnuro

Ghanaian-American Mechanical Engineer and Project Manager leading the commercialization of EV charging infrastructure across Ghana. Currently Engineering Project Manager at the largest natural gas utility in the United States, with prior tenure on the Pipeline Safety Enhancement Plan and Gas Transmission Safety Rule teams — taking $100M+ infrastructure programs across Southern California from concept through design, construction, and final site acceptance testing.

MBA · PMP · B.S. Mechanical Engineering. Built ChargeGo from concept to active deployment in under 12 months — a deliberate application of a decade of infrastructure execution to a market that is ready.

PermittingSitingTechnical CommissioningOperator RelationshipsRegulated Energy
Advisor Bench (In Formation)

Supported by advisors with experience across:

Energy InfrastructureUtilities & GridSolar FarmsSolar Power GenerationEV Charging OperationsGhana MarketCapital MarketsEnergy Regulation
Get in Touch

Investor, partner, or curious?

General Inquiry

Say hello.

Partnership, press, or something else — send a note and we'll get back to you.